Effective March 1, 2023
Schedule A-3
Purchased Power Cost
Adjustment
MDTE #132
When stated in the electric rate
schedule, there shall be included a Purchased Power Cost Adjustment
(PPCA), in addition to the other charges, representative of the
purchased power charges paid by the Templeton Municipal Light Plant
(TMLP).
The PPCA rate per Kilowatt-Hour (KWH) shall be computed
by utilizing the total cost of purchased power paid by TMLP to its
supplier for the period, adjusted for the previous month’s recovery,
divided by the total KWH of energy anticipated to be billed by TMLP for
the period. The PPCA rate shall be calculated to the nearest hundredth
of a cent ($0.0001) in the following manner:
A. Total Purchased
Power cost including NEPOOL interchange charged to Accounts #555 and
#557 (*) for the month divided by:
B. Estimated KWH to be sold
during the month will be compared to:
C. Base period cost of
purchased power per KWH sold plus the generation charge in effect at the
time, amounting to $0.0953 per KWH sold.
The difference between
the base cost and the annual cost per KWH estimated to be sold will be
applied in the monthly billing period. The PPCA be calculated as
follows:
PPCA = [A / B] – C = [A / B] - $0.0953
(*) An
adjustment to the purchased power cost shall be made monthly reflect the
difference between estimated and actual purchased power costs and KWH
sold in the prior period in order to recover or credit any
under-collection or over-collection of purchased power charges.
Schedule NYPA
NYPA
Hydropower Credit
MDTE #136
1. Availability:
Residential customers will receive a credit equal to the number of KWH
billed during the month multiplied by the New York Power Authority
(NYPA) Hydropower Credit Rate determined each month as follows:
NYPA = [(TC – NC) / (PK – NK) * NK] / [PK]
Where:
NYPA is
the NYPA Hydropower Credit Rate for the month
TC is the Total
Purchased Power cost including NEPOOL Interchange charged to Accounts
#555 and #557 for the month.
NC is the total cost of hydropower
from the New York Power Authority for the month.
PK is the total
KWH of power purchased for the month.
NK is the total KWH
purchased from the New York Power Authority for the month.
Schedule A-1
Residential
MDTE #143
1. Availability:
A. For all customers whose
consumption is for residential purposes only
B. For churches and
adjacent church-owned buildings for all religious and residential
purposes
2. Rates:
DELIVERY:
Customer Charge $4.23 per
Month
Distribution Charge $0.0438 per KWH
Transmission Charge
$0.0286 per KWH
Renewable Charge $0.0005 per KWH
SUPPLY:
Generation Charge $0.0894 per KWH
3. Discount:
$0.0100 per KWH
for lighting customers if paid within ten (10) days of date of invoice
(not applicable on minimum charge or when there are amounts in arrears)
4. Minimum Charge:
The minimum charge under the above rate will
be the customer charge of four dollars and twenty-three cents ($4.23)
per month.
5. Reconnection Charge:
The reconnection charge
will be twenty dollars ($20.00) during normal business operation hours,
7:00 a.m. to 2:30 p.m. Any meter reconnected outside of the above hours
or on a weekend or on a holiday will only be performed at a cost of two
hundred dollars ($200.00) with permission from the manager or his
designee. If a bucket truck is required during any meter
disconnect/reconnect for safety purposes the customer will be
responsible for the cost including minimum call pay as directed by the
employees’ union contract.
6. Seasonal Customers:
The
reconnection charge will be fifty dollars ($50.00).
7. Purchased
Power Cost Adjustment (PPCA):
The TMLP’s PPCA, MDTE #132, will apply
to all KWH sold under this schedule.
8. NYPA Hydropower
Adjustment Clause:
The TMLP Hydropower Adjustment Clause, MDTE #136,
will apply to all KWH sold under this schedule.
9. Demand Charge:
If during any billing period the measured demand registration exceeds
ten (10) Kilowatts (KW) there will be an additional charge of eight
dollars ($8.00) per KW for each KW in excess of ten (10).
Schedule C-1
Large
Commercial/Industrial/Municipal
MDTE #144
1.
Availability:
For all customers whose consumption of electricity
exceeds an average monthly usage of ten thousand (10,000) KWH over a one
(1) year period and for all municipal power customers requiring three
(3) phase service
2. Rates:
Part I. Applicable to all C-1
customers whose average monthly demand does not exceed one thousand five
hundred (1,500) KW
DELIVERY:
Customer Charge $18.63 per Month
Distribution Demand Charge $8.00 per KW
Distribution Energy Charge
$0.0044 per KWH
Transmission Energy Charge $0.0243 per KWH
Renewable Charge $0.0005 per KWH
SUPPLY:
Generation Charge
$0.0757 per KWH
Part II. Applicable to all C-1 customers whose
average monthly demand exceeds one thousand five hundred (1,500) KW
DELIVERY:
Customer Charge $18.98 per Month
Distribution Demand
Charge $8.00 per KW
Distribution Energy Charge $0.0137 per KWH
Transmission Energy Charge $0.0214 per KWH
Renewable Charge $0.0005
per KWH
SUPPLY:
Generation Charge $0.0653 per KWH
3.
Purchased Power Cost Adjustment (PPCA):
The TMLP’s PPCA, MDTE #132,
will apply to all KWH sold under this schedule.
4. High Voltage
Metering Adjustment:
The TMLP reserves the right to determine the
metering installation. Where the service is metered at the TMLP’s supply
line voltage, but in no case less than two thousand four hundred (2,400)
Volts, thereby saving the TMLP transformer losses, a discount of one
percent (1%) will be allowed from the amount determined under the
preceding provisions. Such discount is exclusive of the PPCA and
Generation Charge.
5. Credit for High Voltage Delivery:
If a
customer accepts delivery at the TMLP’s supply line voltage, not less
than two thousand four hundred (2,400) Volts, and the TMLP is saved the
cost of installing any transformer and associated equipment, a credit of
thirty cents ($0.30) per KW of billing demand per month shall be allowed
against the amount determined under the preceding provisions.
6.
Demand:
The demand for each month under ordinary load conditions
shall be the greatest of the following:
A. The highest fifteen
(15) minute peak occurring during such month as measured in KW, OR
ninety percent (90%) of the greatest fifteen (15) minute peak occurring
during such month as measured in Kilovolt-Amperes (KVA), OR
B.
Eighty percent (80%) of the greatest demand as so determined above
during the preceding eleven (11) months.
7. Seasonal Service:
For all seasonal services there will be a reconnection charge of one
hundred thirty dollars ($100.00).
8. Terms:
Net thirty (30)
days from date of bill. A monthly interest charge of one-and-a-half
percent (1.5%) annual percentage rate (APR) will be added to unpaid
balance appearing on the bill.
Schedule C-3
Small
Commercial/Industrial/Municipal
MDTE #145
1.
Availability:
For all customers whose consumption of electricity is
other than residential and whose consumption of electricity does not
exceed an average monthly usage of two thousand (2,000) KWH over a one
(1) year period
2. Rates:
DELIVERY:
Customer Charge $8.91
per Month
Distribution Energy Charge $0.0183 per KWH
Transmission
Energy Charge $0.0273 per KWH
Renewable Charge $0.0005 per KWH
SUPPLY:
Generation Charge $0.0849 per KWH
3. Minimum
Charge:
The minimum charge under the above rate will be the customer
charge of seven dollars and seventy-five cents ($8.91) per month.
4. Reconnection Charge:
The reconnection charge will be one
hundred dollars ($20.00) during normal business operation hours, 7:00
a.m. to 2:30 p.m. Any meter reconnected outside of the above hours or on
a weekend or on a holiday will only be performed at a cost of two
hundred dollars ($200.00) with permission from the manager or his
designee. If a bucket truck is required during any meter
disconnect/reconnect for safety purposes the customer will be
responsible for the cost including minimum call pay as directed by the
employees’ union contract.
5. Seasonal Service:
For all
seasonal services there will be a reconnection charge of one hundred
dollars ($100.00).
6. Terms:
Net thirty (30) days from date of
bill; monthly interest charge of one-and-a-half percent (1.5%) annual
percentage rate (APR) will be added to unpaid balance appearing on the
bill.
7. Purchased Power Cost Adjustment (PPCA):
The TMLP’s
PPCA, MDTE #132, will apply to all KWH sold under this schedule.
Schedule C-4
Medium
Commercial/Industrial/Municipal
MDTE #147
1.
Availability:
For all customers whose consumption of electricity is
other than residential and whose consumption of electricity exceeds and
average monthly usage of two thousand (2,000) KWH but does not exceed
ten thousand (10,000) KWH over a one (1) year period
2. Rates:
DELIVERY:
Customer Charge $8.84 per Month
Distribution Demand
Charge $8.00 per KW
Distribution Energy Charge $0.0158 per KWH
Transmission Energy Charge $0.0232 per KWH
Renewable Charge $0.0005
per KWH
SUPPLY:
Generation Charge $0.0746 per KWH
3.
Minimum Charge:
The minimum charge under the above rate will be the
customer charge of seven dollars and seventy-five cents ($8.84) per
month.
4. Reconnection Charge:
The reconnection charge will be
one hundred dollars ($100.00) during normal business operation hours,
7:00 a.m. to 2:30 p.m. Any meter reconnected outside of the above hours
or on a weekend or on a holiday will only be performed at a cost of two
hundred dollars ($200.00) with permission from the manager or his
designee. If a bucket truck is required during any meter
disconnect/reconnect for safety purposes the customer will be
responsible for the cost including minimum call pay as directed by the
employees’ union contract.
5. Seasonal Service:
For all
seasonal services there will be a reconnection charge of one hundred
dollars ($100.00).
6. Terms:
Net thirty (30) days from date of
bill; monthly interest charge of one-and-a-half percent (1.5%) annual
percentage rate (APR) will be added to unpaid balance appearing on the
bill.
7. Purchased Power Cost Adjustment (PPCA):
The TMLP’s
PPCA, MDTE #132, will apply to all KWH sold under this schedule.
Schedule C-5
Gardner Airport Commercial
MDTE #150
1. Availability:
For all commercial
customers presently taking service or eligible to take service at the
airport located at the end of Airport Road in Gardner, MA. These airport
customers are serviced by National Grid and metered at 13,800 Volts via
Airport Road. This schedule will be evaluated annually to assure that
the rates reflect the cost of National Grid’s delivery charges.
2. Rates:
DELIVERY:
Customer Charge $0.63 per Month
Distribution
Energy Charge $0.0863 per KWH
Transmission Charge $0.0306 per KWH
Renewable Charge $0.0005 per KWH
SUPPLY:
Generation Charge $0.2379
per KWH
3. Minimum Charge:
The minimum charge under the above rate
will be the customer charge of seven dollars and seventy–five cents
($0.63) per month.
4. Reconnection Charge:
The reconnection charge
will be one hundred dollars ($100.00) during normal business operation
hours, 7:00 a.m. to 2:30 p.m. Any meter reconnected outside of the above
hours or on a weekend or on a holiday will only be performed at a cost
of two hundred dollars ($200.00) with permission from the manager or his
designee. If a bucket truck is required during any meter
disconnect/reconnect for safety purposes the customer will be
responsible for the cost including minimum call pay as directed by the
employees’ union contract.
5. Seasonal Service:
For all seasonal
services there will be a reconnection charge of one hundred dollars
($100.00).
6. Purchased Power Cost Adjustment (PPCA):
The PPCA
will be adjusted periodically in accordance with the TMLP’s PPCA, MDTE
#132.
7. Terms:
Net thirty (30) days from date of bill. A monthly
interest charge of one-and-a-half percent (1.5%) annual percentage rate
(APR) will be added to unpaid balance appearing on the bill.
Schedule T-3
Commercial/Industrial/Municipal Time-of-Use
MDTE #146
1. Availability:
For all customers
presently taking service or eligible to take service under the TMLP’s
Schedules C-1, C-3 or C-4 and having sufficient off-peak usage to make
this rate more economical than Schedule C-1, C-3 or C-4. Service under
this schedule will be subject to the discretion of the TMLP.
2.
Rates:
DELIVERY:
Customer Charge $8.53 per Month
Distribution
Demand Charge $8.00 per KW
Distribution Energy Charge
On-Peak
$0.0078 per KWH
Off-Peak $0.0142 per KWH
Transmission Charge
On-Peak $0.0290 per KWH
Off-Peak $0.0143 per KWH
Renewable Charge
$0.0005 per KWH
SUPPLY:
Generation Charge $0.0627 per KWH
3. On-Peak and Off-Peak Periods:
On-Peak hours are from 8:00 a.m. to
9:00 p.m. daily on Monday through Friday, excluding holidays. Holidays
are: New Year’s Day, Presidents’ Day, Memorial Day, Independence Day,
Columbus Day, Labor Day, Veterans’ Day, Thanksgiving Day and Christmas
Day. All holidays will be the nationally observed day.
4. Minimum
Charge:
The minimum charge under the above rate will be the customer
charge of seven dollars and seventy–five cents ($8.53) per month.
5. Time-of-Use Metering:
Customers taking service under this rate must
have a suitable meter capable of registering demand and energy in the
defined on-peak and off-peak periods. If such metering is not already
present the customer will be charged the full cost of installing the
required metering.
6. Purchased Power Cost Adjustment (PPCA):
The
PPCA will be adjusted periodically in accordance with the TMLP’s PPCA,
MDTE #132.
7. High Voltage Metering Adjustment:
The TMLP reserves
the right to determine the metering installation. Where service is
metered at the TMLP’s supply line voltage, but in no case less than two
thousand four hundred (2,400) Volts, thereby saving the TMLP transformer
losses, a discount of one percent (1%) will be allowed from the amount
determined under the preceding provisions.
8. Terms:
Net thirty
(30) days from date of bill. A monthly interest charge of one-and-a-half
percent (1.5%) annual percentage rate (APR) will be added to unpaid
balance appearing on the bill.
Schedule N-1
Residential
Net Metering
MDTE #148
1. Availability:
A. For all
distributed solar generation up to a maximum of ten (10) Kilowatts AC
that is for residential purposes only.
B. For all distributed
solar generation up to ten (10) KW AC that is for churches and adjacent
church-owned buildings and/or for all religious and residential
purposes.
2. Rates:
DELIVERY:
Customer Charge $4.23 per Month
Distribution Charge $0.0438 per Net KWH Delivered
Transmission Charge
$0.0286 per Net KWH Delivered
Renewable Charge $0.0005 per Net KWH
Delivered
SUPPLY:
Generation Charge $0.0894 per Net KWH Delivered
DISTRIBUTED GENERATION CREDITS:
Transmission Credit $0.0286 per Net
KWH Received
Generation Credit Per Net KWH Received, the generation
credit shall be equal to the previous billing month’s On-Peak LMP
(Locational Marginal Price) in ISO New England’s WCMA Load Zone.
3. Discount:
One cent ($0.0100) per KWH for lighting customers if paid
within ten (10) days of date of invoice not applicable on minimum charge
or when there are amounts in arrears
4. Minimum Charge:
The
minimum charge under the above rate will be the customer charge of three
dollars and seventy-five cents ($4.28) per month.
5. Reconnection
Charge:
The reconnection charge will be twenty dollars ($20.00)
during normal reconnect hours, 7:00 a.m. to 2:30 p.m. Any meter
reconnected outside of the above hours or on a weekend or on a holiday
will only be performed at a cost of two hundred dollars ($200.00) with
permission from the manager or his designee. If a bucket truck is
required during any meter disconnect/reconnect for safety purposes the
customer will be responsible for the cost including minimum call pay as
directed by the employees’ union contract.
6. Seasonal Customers:
The reconnection charge will be fifty dollars ($50.00).
7.
Purchased Power Cost Adjustment (PPCA):
The TMLP’s PPCA, MDTE #132, will apply
to all KWH sold under this schedule.
8. NYPA Hydropower
Adjustment Clause:
The TMLP’s Hydropower Adjustment Clause, MDTE #136, will
apply to all KWH sold under this schedule.
9. Demand Charge:
If
during any billing period the measured demand registration exceeds ten
(10) KW then there will be an additional charge of eight dollars ($8.00)
per KW for each KW in excess of ten (10).
Schedule C-2
Residential/Commercial/Industrial Private Area Lighting
MDTE
#149
1. Availability:
For all customers taking electric
service under any of the Light Plant’s existing rate schedules A-1, C-1,
C-3, C-4, T-3, N-1, private area lighting may be installed per the
customer’s request in accordance with this rate schedule C-2. All
private area lights will be charged per the tariff below:
100-Watt HPS Roadway Fixture $ 5.69 per Month
150-Watt HPS Roadway
Fixture $ 8.36 per Month
250-Watt HPS Floodlight Fixture $ 13.75 per
Month
400-Watt HPS Floodlight Fixture $ 22.21 per Month
1,000-Watt
HPS Floodlight Fixture $ 52.34 per Month
30’ Class 5 Utility Pole (if
necessary) $ 2.00 per Month
2. Terms:
All private light
fixtures installed under this Schedule C-2 shall be billed for a minimum
of one (1) year from the time the customer has signed his/her area
lighting agreement.